A Wilmslow renovation is a useful time to plan the route between a Starlink dish and the rooms that need internet. The important decisions often come before plastering, decorating or finishing an extension. Agreeing them early can prevent a convenient external mount from leaving an awkward indoor cable route.
Put three positions on one drawing
Mark the candidate dish position, the cable entry and the proposed indoor network equipment. Add the desks, televisions and existing network sockets you want to serve. This does not need to be a technical drawing: a labelled floor plan and photographs can expose conflicting assumptions between the homeowner, builder and installer.
Keep a candidate mounting position provisional until the structure, sky view and safe access have been assessed. An architect’s neat elevation or a photograph taken from the garden does not establish suitability on its own.
Agree who owns each part of the work
Ask who provides any planned containment, makes and seals the external entry, finishes the internal surface and tests the completed connection. Where electricians or other trades are involved, have them coordinate the appropriate routes and separation requirements rather than improvising around installed services.
Specify the exact kit before ordering cable accessories. Connector size, cable type and permitted arrangements vary. A small spare conduit can be of little use if the intended connector cannot pass through it or its bends.

Retain access after the decorating is done
Identify equipment that may need checking or replacement later. Do not bury connectors behind a permanent finish without an agreed service arrangement. Record the route before it is concealed and label accessible ends so the next person does not have to guess.
Discuss cupboards before locating the router inside one. Convenient storage, ventilation and wireless coverage are separate considerations. If the connection arrives at a utility area, a planned wired route to an access point elsewhere may be more useful than expecting Wi-Fi to cross the whole house.
Set two review points
- Before finishes: confirm the actual route, mounting proposal and responsibility for each opening or support.
- After completion: check the network from the rooms in the brief and record any changes made during the build.
Include likely future use, such as an office in a converted room, while the relevant areas are accessible. This is a chance to plan sensibly, rather than a reason to buy unspecified extra equipment. SpaceTek’s existing larger-home Wi-Fi guide covers the indoor coverage decisions in more detail.